Eleven days of handoffs could become four hours of straight-through work.
Built with a COO, Insurance Operations in mind
The kind of team this fits: a UK regional motor insurer running direct and broker channels, roughly 320,000 policies in force, 90 FTE in operations.
A policy that takes eleven days to move from quote to issuance doesn't feel slow to any one person in the chain. It feels slow because it passes through six of them, each waiting on the one before, and a claim on that same policy means starting the handoff chain all over again.
A photo or illustration of what this looks like today, before any of this runs.
Not a feature list. The actual sequence, from the moment the case lands to the moment someone signs it.
Quoting, underwriting, issuance and claims run inside one connected pipeline instead of four separate ones.
Phone, web or app, first notice of loss is captured and structured immediately.
Damage assessment and reserve setting run automatically for claims that fit the straight-through path.
Anything that doesn't fit routes to an adjuster with the full context already attached.
Screenshot of a Zen Studio canvas configured for a workflow like this one.
An adjuster still owns every case that doesn't fit the straight-through path. Automation picks up the routine, not the judgment calls.
Illustrative, based on the shape of a workflow like this one. The real number depends on the case, the team, and how it's configured.
Screenshot of the Zen Pilot dashboard or explainability panel for a run of this workflow.
For a coo, insurance operations, a workflow like this starts as a conversation with Zara, describing the process in plain language and getting a first draft of the team back in the same session. Zen Studio is where engineering opens that draft, sets the guardrails node by node, and versions it before it goes live. Zen Pilot is where it actually runs, and where anyone can watch a case move through it in real time, node by node, with the reasoning attached.